From submission
to approval.

Provide applicants instant clarity on local rules, catch submission errors before intake, and manage application workflows seamlessly in one centralized platform.

See how intake changes

Your workflow, but faster

  1. 01

    Intake

    Receive pre-screened, compliant applications before review starts.

  2. 02

    Review

    Automated deficiency checks eliminate tedious back-and-forth cycles.

  3. 03

    Coordinate

    Streamline inter-department approvals using centralized workflows.

  4. 04

    Approve

    Approve submissions quicker with clear, real-time permit tracking.

Permit
Tracker

Permit Nav packages fully pre-validated submissions and routes them directly to the appropriate municipal departments in the exact digital formats required.

Drawing
Checker

Permit Nav verifies applicant drawings and documentation directly against municipal codes and bylaws to catch deficiencies before they reach plan checkers.

Documents stay private: encrypted in transit and at rest, never sold or shared.

Rule
Verifier

Permit Nav reads the municipal record itself: hundreds of bylaws, checklists, forms, and bulletins, distilled into verified rules that every answer traces back to.

Parcel
Lookup

Instantly pull local zoning and building parameters by searching any property address, visualized directly on an interactive municipal map.

ADDRESS
2210 Hoskins Road, District of North Vancouver, BC
-123.07251, 49.32718 · geocoder score 91
PARCEL
PID 018-472-331
North Vancouver, The Corporation of the District of
No structure on record
Registered plan VAP7120Order from LTSA ↗
ZONING
R2dnv-zoning
OCPRES2· Residential
BUILDING ENVELOPE
FRONT3.1 m
SIDE1.2 m
REAR7.6 m
HEIGHT12 m · 3st
FSR0.55
COVERAGE45%

Values are typical of the zone class and were entered manually. Always confirm against the source PDF — see Zoning details below.

Map shows a 7.6 m uniform inward buffer for reference.

PARKING

Off-street parking per zoning bylaw Part 10 (Off-Street Parking and Loading)

CONDITIONS & CAVEATS

R2 Urban Detached Residential Zone. PROPOSED - DNV Bylaw 8799 (Schedule A), "Bylaw Under Consideration" dated 2 June 2026, NOT yet adopted; verify before relying on it. Principal-building min setbacks: front 3.1m, side 1.2m, rear 7.6m (7.6m abutting a lane; ocean 7.6m). Coach house permitted with its own setbacks (front 15.2m, rear 3.1m / 1.5m abutting lane, side 1.2m). Height: front 6.1m max 6.7/8.5m (2 storeys); remainder max 10.1/11.6m (3 storeys); coach house 6.7/8.5m (2 storeys). Building coverage 55%/45% (<=/>464.5 m2); front 6.1m capped 25%. Max GFA (no coach house) = net lot x0.7+92.9 (<=464.5 m2) / x0.55+92.9 (>464.5 m2), cap 650.3 m2; WITH coach house x0.7+139.4 / x0.55+139.4, cap 696.8 m2; coach house max 130.1 m2. Min subdivision lot 660 m2 / 18m width / 34m depth. Secondary suite + coach house permitted.

SOURCE DOCUMENTS
UNVERIFIED·CONFIDENCE MEDIUM·LLM-EXTRACTED

A new home here would need a demolition permit first.

BLD2021-00247Jun 14, 2021
Single Family Alteration - Major
2210 HOSKINS RD
$18,0005 m away
BLD2018-00093Mar 2, 2018
Single Family Alteration - Major
2210 HOSKINS RD
$42,00038 m away
In a debris flood or debris flow hazard area
Not confirmed
In the Seymour River flood plain
No
In the 1 m sea level rise area
Not confirmed
A stream within 15 m
Not confirmed

Fetched live from muni ArcGIS + OpenDataSoft endpoints (~10006 ms). Not cached. Sources checked: Slope hazard · Streamside protection · Wildfire hazard · Creek hazard · DPA Form and Character · DPA Natural Environment · DPA Energy/Water/GHG · BC — Provincially designated floodplain · Sea level rise · BC — Agricultural Land Reserve.

In any of DNV's development permit areas
Not confirmed
In DNV's wildfire development permit area
No
In DNV's slope hazard development permit area
No
In DNV's natural environment development permit area
Not confirmed
In DNV's streamside development permit area
No
In the Agricultural Land Reserve
No
In DNV's fire limits area
Not confirmed

No structure on record.

BC Building Code (2024)
ALSO APPLIES
BC Plumbing Code (2024)
BC Energy Step Code (current)

BC Building Code + Plumbing Code + Energy Step Code apply. The local municipality's construction / permit bylaw governs application, fees, and any local amendments.

CORNERS
#LATLON
A49.327270-123.072269
B49.327271-123.072751
C49.327090-123.072751
D49.327089-123.072269
BOUNDARY SEGMENTS
EDGELENGTHBEARING
A → B34.94 mN 89° 52' 20" W
B → C20.10 mS 0° 06' 12" W
C → D34.94 mS 89° 51' 15" E
D → A20.12 mN 0° 06' 12" E

From ParcelMap BC. Not a substitute for a registered survey.

burnaby-zoning
Oct 5, 2026 · 903 records
cnv-trees
Oct 1, 2026
coquitlam-zoning
Oct 5, 2026 · 1,087 records
dnv-permits
Oct 5, 2026 · 5,476 records
dnv-zoning
Oct 5, 2026 · 2,616 records
parcelmap-bc
Sep 1, 2026 · 833,237 records
richmond-zoning
Oct 5, 2026 · 2,231 records
source-doc-recheck
Oct 5, 2026
source-doc-reingest
Sep 23, 2026
surrey-zoning
Oct 5, 2026 · 4,272 records
west-van-zoning
Oct 5, 2026 · 300 records
zoning-rules-baseline
Sep 27, 2026
zoning-rules-llm
Sep 28, 2026
zoning-rules-seed
Jun 26, 2026

Read from each municipality's own published data. Confirm with the municipality before making design decisions. They make the determination, not this tool.

We don't check these here yet: Trees, Heritage, Easements, Utilities, Applications.

Clearer submissions

Help applicants prepare thorough packages while streamlining municipal intake and review workflows.

Without

High volume of incomplete files: Caused by applicants guessing through complex bylaws.

With Permit Nav

Receive clean, fully compliant applications with clear, pre-screened requirements before review.

Without

Wasted time on repetitive inquiries: Staff constantly guide applicants through fragmented policies.

With Permit Nav

Instantly cross-reference applicant submissions with local bylaws, required forms, and checklists.

Without

Late-stage revision delays: Zoning conflicts and missing requirements surface late in review.

With Permit Nav

Automated verification catches missing details before reaching plan checkers.

Without

Administrative bottlenecks: Hours spent on manual tracking, follow-ups, and preventable rejections.

With Permit Nav

Accelerating review turnaround times with standardized, complete submissions and predictable progress tracking.

A data-driven system

Every answer is grounded in official regulations, municipality operations, and field experience.

Early access · Metro Vancouver

Permits made simple.

Get early access and test new features by signing up for our demo. You won't receive any spam, just a chance to be part of something great.

Early access · Metro Vancouver

Book a demo

For municipalities

We’ll only contact you for early access and product research.

I’m a…

Please enter your first name.

Enter a valid email address.

Thanks, — you’re on the list.

We’ll reach out as beta seats open in your area.